top of page
Installations
Case Studies
WWTP Arroyo Quiñones (Madrid)
WWTP Arroyo Quiñones (Madrid)
1/1
WWTP ARROYO QUIÑONES (MADRID)
130 kW electrical
224 kW thermal
2 x Capstone CR65 BIO Digester
Biogas fuel from digestion
Hot water production for the
digesters
Complete biogas treatment unit
Control and data acquisition system
Anti-spill system
Turnkey project
Téxtil Tinamar (Portugal)
Téxtil Tinamar (Portugal)
1/1
TÉXTIL TINAMAR (PORTUGAL)
600 kW electrical
1.180 kW thermal
4,00 t/h vapor (with 2.000 kW of post combustion)
1 x Power Package Capstone C600S
LNG fuel
Heat production in two stages:
Process steam
Hot water for process
Power package supply
WWTP Arroyo Quiñones (Madrid)
WWTP Arroyo Quiñones (Madrid)
1/1
WWTP ARROYO QUIÑONES (MADRID)
130 kW electrical
224 kW thermal
2 x Capstone CR65 BIO Digester
Biogas fuel from digestion
Hot water production for the
digesters
Complete biogas treatment unit
Control and data acquisition system
Anti-spill system
Turnkey project
Téxtil Tinamar (Portugal)
Téxtil Tinamar (Portugal)
1/1
TÉXTIL TINAMAR (PORTUGAL)
600 kW electrical
1.180 kW thermal
4,00 t/h vapor (with 2.000 kW of post combustion)
1 x Power Package Capstone C600S
LNG fuel
Heat production in two stages:
Process steam
Hot water for process
Power package supply
WWTP Arroyo Quiñones (Madrid)
WWTP Arroyo Quiñones (Madrid)
1/1
WWTP ARROYO QUIÑONES (MADRID)
130 kW electrical
224 kW thermal
2 x Capstone CR65 BIO Digester
Biogas fuel from digestion
Hot water production for the
digesters
Complete biogas treatment unit
Control and data acquisition system
Anti-spill system
Turnkey project
Téxtil Tinamar (Portugal)
Téxtil Tinamar (Portugal)
1/1
TÉXTIL TINAMAR (PORTUGAL)
600 kW electrical
1.180 kW thermal
4,00 t/h vapor (with 2.000 kW of post combustion)
1 x Power Package Capstone C600S
LNG fuel
Heat production in two stages:
Process steam
Hot water for process
Power package supply
WWTP Arroyo Quiñones (Madrid)
WWTP Arroyo Quiñones (Madrid)
1/1
WWTP ARROYO QUIÑONES (MADRID)
130 kW electrical
224 kW thermal
2 x Capstone CR65 BIO Digester
Biogas fuel from digestion
Hot water production for the
digesters
Complete biogas treatment unit
Control and data acquisition system
Anti-spill system
Turnkey project
Téxtil Tinamar (Portugal)
Téxtil Tinamar (Portugal)
1/1
TÉXTIL TINAMAR (PORTUGAL)
600 kW electrical
1.180 kW thermal
4,00 t/h vapor (with 2.000 kW of post combustion)
1 x Power Package Capstone C600S
LNG fuel
Heat production in two stages:
Process steam
Hot water for process
Power package supply
WWTP Arroyo Quiñones (Madrid)
WWTP Arroyo Quiñones (Madrid)
1/1
WWTP ARROYO QUIÑONES (MADRID)
130 kW electrical
224 kW thermal
2 x Capstone CR65 BIO Digester
Biogas fuel from digestion
Hot water production for the
digesters
Complete biogas treatment unit
Control and data acquisition system
Anti-spill system
Turnkey project
Téxtil Tinamar (Portugal)
Téxtil Tinamar (Portugal)
1/1
TÉXTIL TINAMAR (PORTUGAL)
600 kW electrical
1.180 kW thermal
4,00 t/h vapor (with 2.000 kW of post combustion)
1 x Power Package Capstone C600S
LNG fuel
Heat production in two stages:
Process steam
Hot water for process
Power package supply
bottom of page