top of page
default-pagebanner.jpg
Installations
Case Studies

WWTP ARROYO QUIÑONES (MADRID)

130 kW electrical
224 kW thermal
2 x Capstone CR65 BIO Digester 

Biogas fuel from digestion
Hot water production for the
digesters

 

Complete biogas treatment unit
Control and data acquisition system
Anti-spill system 

Turnkey project

TÉXTIL TINAMAR (PORTUGAL)

600 kW electrical
1.180 kW thermal
4,00 t/h vapor (with 2.000 kW of post combustion)
1 x Power Package Capstone C600S 

LNG fuel
Heat production in two stages:
Process steam
Hot water for process 

Power package supply

WWTP ARROYO QUIÑONES (MADRID)

130 kW electrical
224 kW thermal
2 x Capstone CR65 BIO Digester 

Biogas fuel from digestion
Hot water production for the
digesters

 

Complete biogas treatment unit
Control and data acquisition system
Anti-spill system 

Turnkey project

TÉXTIL TINAMAR (PORTUGAL)

600 kW electrical
1.180 kW thermal
4,00 t/h vapor (with 2.000 kW of post combustion)
1 x Power Package Capstone C600S 

LNG fuel
Heat production in two stages:
Process steam
Hot water for process 

Power package supply

WWTP ARROYO QUIÑONES (MADRID)

130 kW electrical
224 kW thermal
2 x Capstone CR65 BIO Digester 

Biogas fuel from digestion
Hot water production for the
digesters

 

Complete biogas treatment unit
Control and data acquisition system
Anti-spill system 

Turnkey project

TÉXTIL TINAMAR (PORTUGAL)

600 kW electrical
1.180 kW thermal
4,00 t/h vapor (with 2.000 kW of post combustion)
1 x Power Package Capstone C600S 

LNG fuel
Heat production in two stages:
Process steam
Hot water for process 

Power package supply

WWTP ARROYO QUIÑONES (MADRID)

130 kW electrical
224 kW thermal
2 x Capstone CR65 BIO Digester 

Biogas fuel from digestion
Hot water production for the
digesters

 

Complete biogas treatment unit
Control and data acquisition system
Anti-spill system 

Turnkey project

TÉXTIL TINAMAR (PORTUGAL)

600 kW electrical
1.180 kW thermal
4,00 t/h vapor (with 2.000 kW of post combustion)
1 x Power Package Capstone C600S 

LNG fuel
Heat production in two stages:
Process steam
Hot water for process 

Power package supply

WWTP ARROYO QUIÑONES (MADRID)

130 kW electrical
224 kW thermal
2 x Capstone CR65 BIO Digester 

Biogas fuel from digestion
Hot water production for the
digesters

 

Complete biogas treatment unit
Control and data acquisition system
Anti-spill system 

Turnkey project

TÉXTIL TINAMAR (PORTUGAL)

600 kW electrical
1.180 kW thermal
4,00 t/h vapor (with 2.000 kW of post combustion)
1 x Power Package Capstone C600S 

LNG fuel
Heat production in two stages:
Process steam
Hot water for process 

Power package supply

bottom of page